{"id":896,"date":"2024-03-19T17:37:37","date_gmt":"2024-03-19T16:37:37","guid":{"rendered":"https:\/\/gratistidning.com.hemsida.eu\/umea\/blog\/2024\/03\/19\/antagen-plan-for-flerbostadshus-vid-grisbacka-centrum\/"},"modified":"2024-03-19T17:37:37","modified_gmt":"2024-03-19T16:37:37","slug":"antagen-plan-for-flerbostadshus-vid-grisbacka-centrum","status":"publish","type":"post","link":"https:\/\/gratistidning.com\/umea\/blog\/2024\/03\/19\/antagen-plan-for-flerbostadshus-vid-grisbacka-centrum\/","title":{"rendered":"Antagen plan f\u00f6r flerbostadshus vid Grisbacka centrum"},"content":{"rendered":"<div>\n<p><strong>En ny detaljplan g\u00f6r det m\u00f6jligt att bygga 70 nya l\u00e4genheter vid korsningen Backenv\u00e4gen och Grubbev\u00e4gen. Det nya huset blir som mest sju v\u00e5ningar h\u00f6gt. F\u00f6rutom bost\u00e4der blir det m\u00f6jligt att bygga handel, service, samlingslokaler eller andra verksamheter i bottenplan.<\/strong><\/p>\n<p>\u2013 Hartvigsplatsen \u00e4r utpekat som ett visionsomr\u00e5de f\u00f6r ett nytt kvarterscentrum. Det h\u00e4r \u00e4r en viktig del i den utvecklingen av Grisbacka centrum. F\u00f6r ett levande centrum beh\u00f6vs b\u00e5de l\u00e4mpliga lokaler men \u00e4ven tillr\u00e4ckligt underlag i form av boende i omr\u00e5det, och h\u00e4r f\u00e5r vi ett bra tillskott av bost\u00e4der, s\u00e4ger Mikael Berglund (S), byggnadsn\u00e4mndens ordf\u00f6rande.<\/p>\n<p>Detaljplanen har tidigare genomg\u00e5tt hela planprocessen fr\u00e5n samr\u00e5d till antagande. Beslutet om antagande av detaljplanen upph\u00e4vdes dock i domstol p\u00e5 grund av att insynen till n\u00e4rliggande fastigheter ans\u00e5gs bli f\u00f6r stor. Planf\u00f6rslaget har reviderats och kompletterats med \u00e5tg\u00e4rder f\u00f6r att minska risken f\u00f6r insyn fr\u00e5n planomr\u00e5dets friytor till n\u00e4rliggande fastigheter. Planf\u00f6rslaget har d\u00e4refter genomg\u00e5tt en f\u00f6rnyad process.<\/p>\n<p>Befintliga byggnader inom planomr\u00e5det kommer att rivas och ers\u00e4ttas med en ny byggnad och ett underjordiskt garage. Det nya huset varierar i volym och h\u00f6jd i 4\u20137 v\u00e5ningar f\u00f6r att anpassa sig efter befintlig och planerad bebyggelse i omr\u00e5det. Det nya huset rymmer cirka 70 nya bost\u00e4der. Under bost\u00e4derna, i markplan, m\u00f6jligg\u00f6rs det \u00e4ven f\u00f6r centrumverksamhet med tillh\u00f6rande parkeringsgarage. <\/p>\n<p>F\u00f6r centrumverksamheten har alla utredningar utg\u00e5tt fr\u00e5n en livsmedelsbutik. Det \u00e4r dock m\u00f6jligt att det blir verksamheter som \u00e4r av mindre skala \u00e4n en livsmedelsbutik. Det kan bli en kombination av olika verksamheter som handel, service, samlingslokaler eller andra verksamheter som b\u00f6r ligga centralt eller vara l\u00e4tta att n\u00e5. Friyta f\u00f6r boende kan anl\u00e4ggas p\u00e5 taket till centrumverksamheten.<\/p>\n<p>Utifr\u00e5n ber\u00e4kningarna i trafikutredningen finns inga kapacitetsproblem i cirkulationsplatsen Backenv\u00e4gen\/Grubbev\u00e4gen och risken f\u00f6r k\u00f6bildning efter Grubbev\u00e4gen bed\u00f6ms vara mycket l\u00e5g. Varuintag planeras att anl\u00e4ggas mot Skiftesv\u00e4gen vid planomr\u00e5dets nordv\u00e4stra del. H\u00e4r planeras \u00e4ven in- och utfart till underjordiskt garage f\u00f6r bost\u00e4der. Butiksentr\u00e9 planeras mot Grubbev\u00e4gen d\u00e4r \u00e4ven in- och utfart till parkeringsgaraget f\u00f6r kunder planeras.<\/p>\n<h2><strong>Mer information:<\/strong><\/h2>\n<p>Mikael Berglund (S)<br \/>ordf\u00f6rande<br \/>byggnadsn\u00e4mnden<br \/>070-559 71 84<br \/><a href=\"https:\/\/www.mynewsdesk.com\/se\/umea\/pressreleases\/mailto:mikael.berglund@umea.se\" target=\"_blank\" rel=\"nofollow noopener\">mikael.berglund@umea.se<\/a><\/p>\n<p>Robert Axebro (C)<br \/>vice ordf\u00f6rande<br \/>byggnadsn\u00e4mnden<br \/>072-501 95 59<br \/><a href=\"https:\/\/www.mynewsdesk.com\/se\/umea\/pressreleases\/mailto:robert.axebro@umea.se\" target=\"_blank\" rel=\"nofollow noopener\">robert.axebro@umea.se<\/a><\/p>\n<\/div>\n<p>&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8211;<br \/>\n<a href=\"https:\/\/www.mynewsdesk.com\/se\/umea\/pressreleases\/antagen-plan-foer-flerbostadshus-vid-grisbacka-centrum-3311718?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=Subscription&#038;utm_content=current_news\" target=\"_blank\" rel=\"noopener\">Klicka h\u00e4r &#8211; l\u00e4nk till originalinl\u00e4gget<\/a><br \/>\n<br \/>\nK\u00e4lla: Ume\u00e5 kommun<br \/>\n&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8211;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>En ny detaljplan g\u00f6r det m\u00f6jligt att bygga 70 nya l\u00e4genheter vid korsningen Backenv\u00e4gen och Grubbev\u00e4gen. Det nya huset blir som mest sju v\u00e5ningar h\u00f6gt. F\u00f6rutom bost\u00e4der blir det m\u00f6jligt att bygga handel, service, samlingslokaler eller andra verksamheter i bottenplan. \u2013 Hartvigsplatsen \u00e4r utpekat som ett visionsomr\u00e5de f\u00f6r ett nytt kvarterscentrum. Det h\u00e4r \u00e4r en [&hellip;]<\/p>\n","protected":false},"author":59,"featured_media":897,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[52,51],"tags":[],"class_list":["post-896","post","type-post","status-publish","format-standard","has-post-thumbnail","category-umea-kommun","category-kommunen"],"featured_image_src":"https:\/\/gratistidning.com\/umea\/wp-content\/uploads\/sites\/22\/2024\/03\/kdn8un9puglve9rutpiz-1024x576.jpeg","blog_images":{"medium":"https:\/\/gratistidning.com\/umea\/wp-content\/uploads\/sites\/22\/2024\/03\/kdn8un9puglve9rutpiz-300x169.jpeg","large":"https:\/\/gratistidning.com\/umea\/wp-content\/uploads\/sites\/22\/2024\/03\/kdn8un9puglve9rutpiz-1024x576.jpeg"},"acf":[],"ams_acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-27 03:25:48","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/gratistidning.com\/umea\/wp-json\/wp\/v2\/posts\/896","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gratistidning.com\/umea\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gratistidning.com\/umea\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gratistidning.com\/umea\/wp-json\/wp\/v2\/users\/59"}],"replies":[{"embeddable":true,"href":"https:\/\/gratistidning.com\/umea\/wp-json\/wp\/v2\/comments?post=896"}],"version-history":[{"count":0,"href":"https:\/\/gratistidning.com\/umea\/wp-json\/wp\/v2\/posts\/896\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gratistidning.com\/umea\/wp-json\/wp\/v2\/media\/897"}],"wp:attachment":[{"href":"https:\/\/gratistidning.com\/umea\/wp-json\/wp\/v2\/media?parent=896"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gratistidning.com\/umea\/wp-json\/wp\/v2\/categories?post=896"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gratistidning.com\/umea\/wp-json\/wp\/v2\/tags?post=896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}